MAXIMO Panel Formwork

Company information

PERI Malaysia Logo

PERI Malaysia

Company location

Company location: Malaysia

Description

Developed by PERI, the MX tie technology with one-sided tie installation greatly accelerates formworking operations. At the same time, MAXIMO is significantly faster than conventional panel formwork despite the lower site personnel requirements. Due to the innovative tie technology and optimized number of tie points, working time values for the system are verifiably up to 50% less. In addition, the centrally-arranged tie points result in a regular joint and tie pattern both horizontally and vertically.

 

Faster tie installation

through the one-sided tie technology without spacer tubes and cones

 

Minimum of anchors

through the optimized tie point arrangement

 

Improved concrete finish

through the neat joint and tie arrangement